#20 - Day 2 of Drilling a New Oil Well
#20 - Day 2 of Drilling a New Oil Well
Day 2 of Drilling a New Oil Well.Oil, Gas, Oil and Gas, Drilling, Oil and Gas Drilling, Oil and Gas Exploration, Seismic... Read more
28 Jul 2018
•
1min
#19 - Day 1 of Drilling a New Oil Well
#19 - Day 1 of Drilling a New Oil Well
Day 1 of drilling a new oil well. Oil, Gas, Oil and Gas, Drilling, Oil and Gas Drilling, Oil and Gas Exploration, Seismi... Read more
27 Jul 2018
•
1min
Similar Podcasts
#18 - Cementing the Casing
#18 - Cementing the Casing
Mike discusses the cementing plan for an upcoming well. The bid from the cementing service company includes two parts: a... Read more
25 Jun 2018
•
18mins
# 17 - Mud Logging Revisited
# 17 - Mud Logging Revisited
Mike takes a fresh look at Mud Logging procedures on a drilling rig -especially the methods of collecting cutting sample... Read more
20 Jun 2018
•
40mins
# 16 - Coring Plan for an Upcoming Well
# 16 - Coring Plan for an Upcoming Well
Mike discusses coring a well that he will be drilling soon. He is considering taking a 60-ft conventional core to evalua... Read more
10 Jun 2018
•
14mins
# 15 - Formation Evaluation Methods
# 15 - Formation Evaluation Methods
Mike discusses the methods of Formation Evaluation that he may use to assess the commercial capacity of a well he will b... Read more
2 Jun 2018
•
25mins
# 14 - Drilling Permit Approved
# 14 - Drilling Permit Approved
We received a drilling permit to drill our oil. In Texas, the oil and gas industry is regulated by the Texas Railroad Co... Read more
27 May 2018
•
7mins
# 13 - Casing Design for a Well Mike is Going to Drill Soon
# 13 - Casing Design for a Well Mike is Going to Drill Soon
Mike talks about the casing design for an oil well he is going to drill soon. Casing is the permanent pipe that is place... Read more
20 May 2018
•
24mins
# 12 - Side Swipe in 2-D Seismic Data and How 3-D is Better
# 12 - Side Swipe in 2-D Seismic Data and How 3-D is Better
Mike talks about the phenomenon of "side swipe" in old 2-D seismic data. Mike has located a 50-acre structure in 3-D sei... Read more
13 May 2018
•
3mins
# 11 - Preparing a Drilling Prognosis for an Upcoming Oil Well
# 11 - Preparing a Drilling Prognosis for an Upcoming Oil Well
Mike talks about preparing a drilling prognosis for an oil well he is about to drill in the next 60 days. A drilling pro... Read more
9 May 2018
•
15mins